Projects

Project title

Successful installation of 3 × 10,000 kg/h ST36 Cochran steam boilers for a food processing plant

description

The boilers are equipped with Autoflame Engineering Limited MK8 controllers, ensuring reliable operation and advanced combustion control.

The scope of Egyptian Engineering Agencies - EEA included the complete supply of the boiler room equipment, such as:

  1.  Pressurised feedwater tank
  2.  Blowdown tank
  3.  Chimneys
  4.  Steam header